Boddington Gold SMP Works

Project Overview:

The Newmont Boddington Gold Mine, one of Australia’s largest gold producers, required comprehensive structural, mechanical, and piping (SMP) works to support its large-scale operations. At full capacity, the mine is expected to produce between 35–40 million tonnes per annum, with a mine life exceeding 20 years. The project included the installation of critical infrastructure to enable seamless production and processing, ensuring the mine’s operational longevity and efficiency. Altrad (formerly AusGroup), through its legacy operations, delivered integrated services critical to the project’s success.

Scope:

The project scope entailed a diverse range of tasks, including:

  • Supply and erection of the fine ore bin.
  • Structural, mechanical, and piping (SMP) works for the eight-cell screening building, including feed conveyors.
  • Installation and commissioning of four 15MW ball mills.
  • SMP works in the classification area, ensuring smooth integration with other operations.
  • Interconnecting conveyor systems from the crushing and stockpile areas.
  • Civil works, shop detailing, and supply, fabrication, surface treatment, and delivery of 4,600 tonnes of structural steel pipes and electrical racks.

Manning:

  • Expertise across structural, mechanical, piping, and commissioning services
  • Peak manning:635 personnel

Outcomes:

  • Successfully delivered key infrastructure supporting one of Australia’s largest gold producers, ensuring long-term operational efficiency.
  • Completed the fabrication and installation of 4,600 tonnes of structural steel and associated infrastructure on schedule.
  • Delivered seamless integration between the mine’s crushing, stockpile, and processing areas, minimising downtime.
  • Ensured a high-quality finish with surface treatment and detailed shop fabrication, meeting strict project specifications.
  • Leveraged a skilled workforce of 635 personnel to execute complex tasks safely and efficiently.
  • Reinforced the client’s trust in Altrad’s ability to deliver large-scale, technically complex projects within budget and timeframe.
Client

AKCMR

Location

Boddington, Western Australia

Duration

2007 – 2009