Atlas Gas Compressor Station – Construction

Project Overview:

The Atlas Gas Compressor Station was constructed to deliver 32 TJ/day of export-quality gas. The facility processes wet, low-pressure coal seam methane gas from Senex’s gathering system, compressing and dehydrating it before delivering it to market. Designed as an unmanned facility, it is operated remotely from a central control room in Melbourne. Altrad (formerly Valmec) executed the turnkey construction, leveraging modular pre-assembled pipe rack skids to minimise installation time on-site.

Scope:

Altrad’s scope of work included:

  • Bulk earthworks, concrete works, and piling.
  • Road construction and structural, mechanical, and piping (SMP) installations.
  • Electrical and instrumentation (E&I) works.
  • Construction of permanent buildings and associated infrastructure.
  • Commissioning support for the facility.

Key Features of the Facility:

  • Two inlet slug catchers with automatic level control and dumping.
  • Enclosed ground flare system.
  • Five screw compressor packages and five reciprocating compressor packages.
  • Tri-ethylene Glycol (TEG) gas dehydration unit.
  • Switchroom, gas, and diesel power generation units.
  • Instrument air package and gas metering systems.
  • Chromatograph and moisture analyzer, along with an oily water treatment unit.

Outcomes:

  • Delivered the facility on schedule and to Jemena’s specifications.
  • Accelerated Installation: Utilised driven steel pile foundations and modular pre-assembled pipe rack skids to reduce installation time.
  • Regional Workforce: Mobilised a workforce of over 100 personnel, predominantly from the region, to ensure timely project delivery.
  • Supported Jemena’s operations with a state-of-the-art, remotely operated compressor station capable of handling complex processing requirements.
  • Reinforced Altrad’s reputation for executing large-scale, technologically advanced gas infrastructure projects, following the successful delivery of the NGP Mt Isa Compression Facility project in 2018.
Client

Jemena

Location

Wandoan, Queensland, Australia

Duration

40 weeks Completion: October 2019

Industry
Energy Utilities