Hydrogen Park South Australia

AGIG Hydrogen Park EPC

Client

AGIG

Completion

December 2020

Location

Tonsley, South Australia

Sector

Energy

OVERVIEW

AGIG’s Hydrogen Park of South Australia (HyP SA) will deliver a 1.25 megawatt electrolyser at the Tonsley Innovation District.

Valmec (now part of Altrad) was contracted as EPC for the onsite infrastructure for South Australia’s first renewable hydrogen production facility, in Tonsley Innovation District, Adelaide.

  • 25 MW Electrolyser
  • 100 KG Hydrogen per Day
  • 100% Renewable Energy

Properties around the HyP SA facility will be supplied with blended renewable hydrogen gas through the existing gas network, as part of a five year demonstration.

THE SCOPE
  • 25MW Hydrogen Electrolyser
  • Engineering, Design & Construct
  • Major Procurement
  • Civil Works
  • Structural, Mechanical & Piping
  • Electrical & Instrumentation
  • Commissioning
ENGINEERING EXCELLENCE

In conjunction with our engineering partner GPA Engineering, HyP SA has received a number of accolades in recognition of its role in demonstrating the pathway to a cleaner energy future, including:

  • 2020 Engineers Australia Australian Engineering Excellence Award winner
  • 2020 South Australian Premiers Awards for Energy and Mining, Innovation and Collaboration’ category commendation
  • 2020 SA Climate Leaders Awards, ‘Business and Industry’ category winner
  • 2020 Australian Pipelines and Gas Association Environment Award winner
  • Winner MENA Hydrogen Project of the Year 2022
  • We achieved over 90% local employment and 50% local spend.
CHALLENGES

This facility is the largest renewable Hydrogen generation facility delivered in Australia to date.

The facility is also the first to blend gas into an existing domestic gas distribution network.

The site, which is located in  an urban infill area within Adelaide, has required due consideration during design to potential impacts on neighbouring land use.

SOLUTIONS

Valmec has worked with AGIG during the ECI phase and then through detailed design to address the projects technical challenges.

 

CLICK HERE TO VIEW VIDEO